Switching order, isolation points, test for dead, earths, locks & tags, approach distances, arc-flash PPE.
One safety system for power, solar, gas and water sites — switching & isolation, confined space, work-at-height and hot-work permits, observations, incidents and contractors, started from templates written for your site.
One safety system for an energy or utility site, started from templates written for it — switching and isolation permits, confined space, work at height and hot work, with observations, incidents, training and contractors all in one place.
Switching & isolation, confined space, work at height, hot work.
Observations and near misses from a phone or an area code.
Status per topic: current, due within 30 days, or expired.
Existing phones and printed QR codes — that's it.

Switching and isolation permits capture the switching order number, isolation points, test for dead, earths applied, locks and tags, approach distances and arc-flash PPE category, with issuer and receiver. The approval chain runs Operations, HV Electrical, then the issuer — and each department applies its own lock.
Anyone can report an unsafe act, unsafe condition, near miss or hazard from a phone or an area QR code, with no sign-in. Observations go to the responsible department with a fix-by date set by severity and escalate when late; incidents are investigated to root cause with actions, owners and due dates — and a near miss with arc-flash potential gets the same attention as an injury.

Permits, training topics and site audits come as templates you add in one step and edit. Each permit carries the specific controls its work demands — not a generic form.
Switching order, isolation points, test for dead, earths, locks & tags, approach distances, arc-flash PPE.
O2, LEL, H2S and CO readings with limits, ventilation, an attendant and a rescue plan.
Fall-arrest inspection, anchor, rescue plan and a wind-speed limit.
Combustibles and vegetation cleared, extinguisher, gas test, and a fire watch after work.
Permits, training topics and site audits, added in one step and editable to your site.
Observations, near misses, incident root-cause investigation, and phone-approved permits.
Training currency and contractor insurance validity are checked before work starts.

The training matrix shows status per topic — current, due within 30 days, or expired — from acknowledged sessions, covering HV switching authorization, arc flash, confined space, fall protection and more. Contractor crews are cleared by insurance certificates checked against your minimums, with reminders before policies lapse.
Single-machine lockouts follow a written energy-control procedure with each person's lock recorded by name, and the reports page turns the records into a PDF or CSV over 30 days, 90 days or 12 months.
A written energy-control procedure, lock by name.
Checklists for substation, PV block, inverter, O&M.
Permit status, training and more.
Invite colleagues, with owners and admins managing who has access.
Ask questions and get answers from your own safety records.
Export everything to Excel, PDF or CSV, any time.
US hosting, with each company's records kept separate.
Run permits, isolation, incidents and audits from one safety system.
See what's isolated now, what's open and late, across the site.
Switching, isolation and lock control with the right approval chain.
Report by QR with no account; crews cleared by their certificates.
Switching and isolation, confined space, work at height and hot-work permits, with observations, incidents, training and contractors — started from templates written for your site. Load the sample plant and edit to fit.