iFactory · Energy & Utility EHS For EHS, site & operations leads

Permits, isolation and LOTO for energy & utility sites

One safety system for power, solar, gas and water sites — switching & isolation, confined space, work-at-height and hot-work permits, observations, incidents and contractors, started from templates written for your site.

  • Switching & isolation, confined space, height and hot-work permits
  • Each department applies its own lock — a permit can't close while any is on
  • Observations and incidents from a phone or an area QR, no sign-in
Switching & isolation Arc-flash PPE No hardware needed
Start free trial→ 14-day trial · no card required
Permit SW-114 · IsolationCollector substation · HV feeder 2
Arc-flash CAT 2
Isolation pointState
Switched & isolatedSwitching order SO-2291
Done
Tested for dead · earths appliedLocks & tags in place
Locked
Receiver sign-onHV Electrical approval
Pending
Can't close while any lock is on2 locks on
Live what's isolated
right now
Safety for energy & utility sites

Switching, isolation, permits and contractors on a phone

One safety system for an energy or utility site, started from templates written for it — switching and isolation permits, confined space, work at height and hot work, with observations, incidents, training and contractors all in one place.

4
permit types

Switching & isolation, confined space, work at height, hot work.

QR
report, no sign-in

Observations and near misses from a phone or an area code.

30 d
training window

Status per topic: current, due within 30 days, or expired.

0
hardware needed

Existing phones and printed QR codes — that's it.

A switching and isolation permit — switching order, isolation points, test for dead, earths, locks and tags, arc-flash PPE
Switching & isolation

Every lock on record, nothing closes while one is on

Switching and isolation permits capture the switching order number, isolation points, test for dead, earths applied, locks and tags, approach distances and arc-flash PPE category, with issuer and receiver. The approval chain runs Operations, HV Electrical, then the issuer — and each department applies its own lock.

  • Approval chain: Operations → HV Electrical → issuer
  • Each department's lock is on or off; all must clear to close
  • The overview shows what is isolated right now
Observations & incidents

Reported from anywhere on the site, owned to a fix

Anyone can report an unsafe act, unsafe condition, near miss or hazard from a phone or an area QR code, with no sign-in. Observations go to the responsible department with a fix-by date set by severity and escalate when late; incidents are investigated to root cause with actions, owners and due dates — and a near miss with arc-flash potential gets the same attention as an injury.

  • Unsafe act, unsafe condition, near miss or hazard — by QR
  • Fix-by date by severity, escalated when late
  • Incidents investigated to a root cause, with actions
Observations and incidents reported from a phone or QR, with root-cause investigation
Templates written for an energy site

Four permit types, each with the checks the job needs

Permits, training topics and site audits come as templates you add in one step and edit. Each permit carries the specific controls its work demands — not a generic form.

Switching & isolation

Switching order, isolation points, test for dead, earths, locks & tags, approach distances, arc-flash PPE.

Confined space

O2, LEL, H2S and CO readings with limits, ventilation, an attendant and a rescue plan.

Work at height

Fall-arrest inspection, anchor, rescue plan and a wind-speed limit.

Hot work

Combustibles and vegetation cleared, extinguisher, gas test, and a fire watch after work.

How it works

Three steps from a template to a site on record

1

Templates for energy sites

Permits, training topics and site audits, added in one step and editable to your site.

2

Report from a phone or QR

Observations, near misses, incident root-cause investigation, and phone-approved permits.

3

People and contractors cleared

Training currency and contractor insurance validity are checked before work starts.

Training matrix and contractor clearance — current, due or expired training, and contractors cleared by insurance certificates
Training & contractors

Cleared people and cleared crews before work starts

The training matrix shows status per topic — current, due within 30 days, or expired — from acknowledged sessions, covering HV switching authorization, arc flash, confined space, fall protection and more. Contractor crews are cleared by insurance certificates checked against your minimums, with reminders before policies lapse.

  • Training: current, due within 30 days, or expired
  • Contractors: cleared or not cleared, by certificate
  • Reminders sent before a policy lapses
Every lock on record, every report to hand

Lockouts by name, reports that show your records

Single-machine lockouts follow a written energy-control procedure with each person's lock recorded by name, and the reports page turns the records into a PDF or CSV over 30 days, 90 days or 12 months.

Lockouts

A written energy-control procedure, lock by name.

R. Mehta Locked
A. Okafor Locked
Audits

Checklists for substation, PV block, inverter, O&M.

Inverter station Scored
Each "no" → observation
Reports

Permit status, training and more.

✓ 30 / 90 days or 12 months · PDF or CSV
Included with every tool

Everything comes standard

✓

Your whole team

Invite colleagues, with owners and admins managing who has access.

✓

iFactory AI

Ask questions and get answers from your own safety records.

✓

Your data stays yours

Export everything to Excel, PDF or CSV, any time.

✓

Hosted in the US

US hosting, with each company's records kept separate.

Who it's for

Built for power, solar, wind, gas and water sites

EHS managers

Run permits, isolation, incidents and audits from one safety system.

Site managers

See what's isolated now, what's open and late, across the site.

Operations leads

Switching, isolation and lock control with the right approval chain.

Field crews & contractors

Report by QR with no account; crews cleared by their certificates.

Questions

Energy & utility EHS questions, answered

Does it replace our switching program?+
No — it keeps the permit and lock records but doesn't replace your switching rules. Your switching program stays the authority; this is where the permits, isolations and locks are recorded and tracked. Start a free trial or book a demo.
Can we change the templates?+
Yes — permits, training topics and site audits come as templates you add in one step and edit to match your site. Try it free or book a demo.
Do field crews need an account to report?+
No — reporting via an area QR code needs no account. Only people who act in the app need a user seat; others can be listed and receive emails. Start a free trial or book a demo.
Does it work for wind, gas and water sites too?+
Yes — it's built for power, solar, wind, gas and water sites, with templates you edit to fit the site you run. Try it free or book a demo.
Can we try it before setting up our own site?+
Yes — preview with the sample 120 MW solar plant and collector substation, and remove it in one click. The trial needs no card and includes Pro features, 1 user, up to 15 assets and 10 AI questions a day. Start free or book a demo.
Can I bring our existing spreadsheet?+
Yes — upload it with one-time column matching, then add or edit entries individually. Only people in your company can see your records, and every change is logged. Start a free trial or book a demo.
Energy & Utility EHS

Try Energy & Utility EHS free for 14 days

Switching and isolation, confined space, work at height and hot-work permits, with observations, incidents, training and contractors — started from templates written for your site. Load the sample plant and edit to fit.

14-day free trial · Pro features · no card required · from $19/user/mo

Confined space · gas testVault 3 · pre-entry
O2
20.9%
In range
LEL
0%
In range
H2S
0ppm
In range
CO
2ppm
In range
Attendant & rescue plan set · entry permitted
<