iFactory · Maintenance Work Orders

Scan at the machine, work it on the board

A QR label on every machine turns a problem into a work order in seconds — no sign-in for operators — and your maintenance team runs it to Done on one board, with parts, time and PM schedules all in place.

  • QR label at each machine — report a problem with a photo, no account
  • Board stages: New, Assigned, In progress, Waiting, Done
  • PM schedules by calendar or meter, plus MTTR and backlog
Start free trial→ 14-day trial · no card required
Scan · no sign-in
Report a problem
+ Add photo
Work order boardLive
New 2
Filler leakUrgent
Belt slipMedium
In progress 1
Pump sealHigh
Waiting 1
GearboxParts
QR reports land hereNew → Done
From a problem to a closed job

A work order should start the moment a machine does something wrong

Paper slips and passing words lose jobs, hide parts cost, and bury the assets that break down most. A QR label at the machine and one board for every work order close that gap end to end.

0
sign-ins to report

Operators scan the label, describe the problem, add a photo.

5
stages on the board

New, Assigned, In progress, Waiting, Done.

4 hr
urgent due time

High 1 day · medium 3 days · low 2 weeks.

2
PM trigger types

By calendar, by meter, or whichever comes first.

Reporting a problem at the machine by scanning a QR label with a phone
Assets & QR labels

A QR label on each machine — scan opens a report, no sign-in

Each machine gets a QR label. Scanning it opens a short report form on any phone, with no sign-in and the asset pre-filled. A lost label can be replaced, and the old one stops working.

  • Scan, describe the problem, add a photo — the asset is already filled in
  • Assets sit in a tree of areas and parts, each with its own history
  • Assets can carry a meter — run hours, km, miles, cycles or a custom count
Working the board

Assign, start, wait on parts, and close — all on one board

Every work order moves through New, Assigned, In progress, Waiting and Done, like a ticket. A Waiting job says why — parts, a planned stop or another trade — and a good work order holds the asset, the problem in the finder's words, a photo, priority, whether the line is stopped, the owner, what was done, parts, labour hours and downtime.

  • Due times from when raised: urgent 4h, high 1d, medium 3d, low 2w — overdue flagged
  • Every move, comment and photo kept in the work order's activity
  • A supervisor checks finished work and closes it
The work order board with New, Assigned, In progress, Waiting and Done columns
How it works

Three steps from a QR scan to a closed job

1

A QR label on each machine

Anyone scans it and reports a problem with a photo, without signing in — issues reach the board the moment they're spotted.

2

Work it on the board

Assign, start, wait on parts and close work orders, with comments, photos, parts and time logged on each job.

3

See where the time goes

Planned vs reactive work, PM compliance, backlog and the assets that break down most — with a PDF for the weekly meeting.

PM schedules

PMs by the calendar, by the meter, or whichever comes first

Assets carry a meter, so a PM triggers by date, by run hours, km or cycles, or by whichever arrives first — and the work order is raised up to 7 days or 50 hours ahead, so planned work never sneaks up.

By calendar

Triggered by a date interval.

Chiller PM Every 3 mo
Safety check Monthly
By meter

Triggered by run hours, km or cycles.

Gearbox service 500 hrs
Conveyor belt 50k cycles
Raised ahead

Whichever comes first, on the board early.

✓ Up to 7 days or 50 hours ahead
Parts & stock

Parts on the work order, stock that keeps itself honest

Pick a part by its name, part number or bin — the list shows how many are on the shelf. Using a part creates a stock move on that job and shows its parts cost; reduce or remove it and the stock returns.

Pick & log

By name, part number or bin — with on-shelf count shown.

Shaft seal #SS-22 12 on shelf
Drive belt B-140 Bin A3
Stock moves

Using a part moves stock; removing it returns it.

Used on WO-1183 −2
Never below zero Warned
Kits & low stock

A PM carries the parts and tools each job starts with.

✓ A part that runs low offers its order
Maintenance analysis — planned vs reactive work, PMs on time, backlog, response time and MTTR
Analysis

See where the time goes, and bring a PDF to the meeting

Analysis shows planned versus reactive work, PMs on time, the backlog and the assets that break down most — from your own work orders or an export of the CMMS you use today. A PDF is ready for the weekly meeting.

  • Response time runs from report to pickup
  • MTTR is the mean time from repair start to done
  • Planned vs reactive, PMs on time, backlog and bad actors
One board for everything

PMs and inspection findings land on the same board

Planned work and failed inspections don't live in a second place — they arrive as work orders in New, alongside the problems reported by QR, so the team has one list to work.

✓

QR reports

Scanned at the machine, no sign-in.

→
✓

PM schedules

Each PM raises its own work order, with steps.

→
✓

Inspection findings

A failed item lands in New, with its photo.

Findings from inspection rounds, same board

Inspection is a separate app that works with Maintenance on the same asset list. A failed item on a round raises a work order with the item's priority, its photo, and a link back to the round — it lands in New on this board like any other job.

Included with every tool

Everything comes standard

✓

Your whole team

Invite colleagues, with owners and admins managing who has access.

✓

iFactory AI

Ask questions and get answers from your own maintenance records.

✓

Your data stays yours

Export to Excel or PDF any time; nothing is deleted if a trial ends.

✓

Hosted in the US

US hosting, with each company's records kept separate.

Who it's for

Built for the maintenance team and the floor around it

Maintenance managers

Run the board, set priorities and PM schedules, review where time goes.

Engineers

Assigned work through the People list — given jobs without signing in.

Operators

Report problems by scanning the machine's QR label — no account needed.

Plants with assets

Machines in a tree of areas and parts, each with its own history.

Questions

Maintenance work order questions, answered

Do operators need an account to report a problem?+
No — they scan the machine's QR label with a phone, describe the problem and add a photo. Only the maintenance team signs in. Start a free trial or book a demo.
Can we give work to engineers who never sign in?+
Yes — add them to the People list with their team and assign work as usual. Operators who only scan and engineers who are only assigned work don't count as paid users. Try it free or book a demo.
Can a PM go by run hours instead of dates?+
Yes — assets can have a meter, and PMs trigger by meter (run hours, km or cycles), by date, or whichever comes first, raised up to 7 days or 50 hours ahead. Start a free trial or book a demo.
Does it replace our CMMS?+
It covers daily work — work orders, floor reports, PM scheduling and spare parts (inspection rounds are a separate app). Keep a CMMS for planning and still analyze exports here. Try it free or book a demo.
Can we try it before adding our own equipment?+
Yes — load the sample plant, Maple Valley Dairy, and remove it with one click; your records are untouched. The trial needs no card and includes Pro features, 1 user, up to 15 assets and 10 AI questions a day. Start free or book a demo.
Can I bring our existing spreadsheet?+
Yes — upload it, match the columns once, then add or edit entries one by one. Only people in your company can see your records, and every change is logged. Start a free trial or book a demo.
Maintenance Work Orders

Try Maintenance free for 14 days

Work orders on a board, problems reported by QR at the machine, PM schedules by calendar or meter, and a PDF for the weekly meeting. Load the sample plant and add your own assets when you're ready.

14-day free trial · Pro features · no card required · from $19/user/mo

Reported, worked, closed
1
Scan the QR labelReport a problem, no sign-in
✓Assign
✓Parts
✓Time
✓
Closed & measuredMTTR, backlog, bad actors