Write the shift log on a phone
Cover safety, quality, production, maintenance and open issues for each area or line. Open items from the last shift are already there.
One log per area or line — Safety, Quality, Production, Maintenance and Open issues — filled in on a phone during the shift, with open items carried forward and a signed handover between supervisors.
When the shift log lives in a notebook or a quick chat at the door, open items get lost, the handover isn't signed, and nobody can find last Tuesday's night shift when they need it. Shift Handover writes it down, signs it, and keeps it searchable.
Safety, Quality, Production, Maintenance and Open issues — the same structure every time.
shifts an open item can sit unresolved — now it's visible on every log until closed.
outgoing supervisor hands over, incoming supervisor accepts — name and time on each.
A shift log for each area or line — covering safety, quality, production and maintenance notes, open items carried forward, and a signed handover between supervisors.
Each handover runs the same beats — the outgoing supervisor writes the log and signs, the incoming supervisor reads and accepts — and anything still open carries forward to the next log for that area.
Fills the five sections on a phone; last shift's open items are already there.
Signs the log — it shows "Handed over," with name and time recorded.
Reads the log and signs to accept — it shows "Accepted," name and time recorded.
Find any past log by word, area or shift, and download it as a PDF.
Open items don't reset at the handover — anything unresolved appears on later logs for that area until someone closes them, showing which log it was raised in and how many shifts it's been carried.
Each log opens with the same five sections, the production numbers, the open items carried from earlier shifts, and the two signatures — written on a phone during the shift and signed at the handover.
Shift Handover in use, with sample records.
Start from the areas and lines you already run, then let the five sections and the open-item carry-forward do the rest.
Cover safety, quality, production, maintenance and open issues for each area or line. Open items from the last shift are already there.
The outgoing supervisor signs, and the incoming one reads and accepts. Anything still open carries forward.
Search past logs by word, area or shift, and download each report as a PDF, with CSV export for logs and items.
Each shift log uses the same structure, so nothing gets forgotten and every handover reads the same way — Safety, Quality, Production and Maintenance notes, plus the Open issues that carry forward.
Short notes, flag the key ones in red.
Planned, made, scrap, downtime, crew.
Carried forward until someone closes.
Each item records what is open, who should act, and which section it belongs to. It shows the log it was raised in and how many shifts it has been carried. The Open items page lists them oldest first, including closed items and who closed them.
The outgoing supervisor signs and the log shows "Handed over." The incoming supervisor signs to accept, and it shows "Accepted." Each signature records name and time. An owner or admin can reopen a signed log with a reason, which clears both signatures and keeps the history.
Outgoing supervisor has signed the log.
Incoming supervisor has signed to accept.
Admin can reopen with a reason.
Search by words, area, shift, supervisor, status and dates. Each log prints as a PDF with its sections, production numbers, open items and both signatures. Reports cover 7, 30 or 90 days, and logs and items download as CSV.
Invite colleagues so supervisors can write, hand over and accept logs across every shift.
Ask questions and get answers from your own shift records, in plain language.
Export logs and items anytime; if the trial ends without a plan, nothing is deleted.
US hosting, with each company's records kept separate from everyone else's.
If the line keeps running after your crew clocks out, the handover is where things slip — and this is where it stops slipping.
Assembly and machining lines where job status and maintenance notes must survive the change.
Continuous runs where quality, cleaning and open issues have to pass forward cleanly.
Control rooms where safety notes and open work carry real consequences across shifts.
Several areas and lines, each with its own log, kept separate but searchable together.
The point isn't more paperwork — it's a handover the next supervisor can trust and anyone can find again.
Unresolved items stay on later logs until someone closes them — no item carried for nine shifts in silence.
Outgoing hands over, incoming accepts — name and time on each, so accountability is clear.
Five fixed sections mean nothing is skipped and every shift reads the same way.
Search any past log by word, area or shift, and print the shift report as a PDF.
The things operations and EHS managers ask before they start.
A shift log for each area or line — the same five sections, open items carried forward, and a signed handover between supervisors. Start with sample data and add your own areas when you're ready.
14-day free trial · Pro features · no card required · from $19/user/mo