In an electric arc furnace, minutes are the unit of output. Every minute removed from tap-to-tap time is a minute of furnace capacity returned, yet most of the avoidable minutes are not in the melting itself. They sit in charging gaps, waiting for ladles, sampling delays and turnaround tasks done one after another. Because those delays are short and scattered, they vanish into averages and nobody owns them. A playbook that measures every phase, ranks the delays and fixes the largest ones first turns scattered minutes into a plan. Melt shops that want to see their own cycle broken down can watch a tap-to-tap breakdown built from their own heat records in a short session.

EAF Energy Optimization · Cycle Time

Find the Minutes Hiding Inside Every Tap-to-Tap Cycle

iFactory AI splits each heat into charging, melting, refining, tapping and turnaround, then ranks the delays that cost the most furnace time.

55
minutes tap-to-tap
Charging6 min
Melting30 min
Refining12 min
Tapping4 min
Turnaround3 min
Illustrative cycle for one heat.

What a Minute Is Worth

Heats per day rise faster than the minutes removed, because the cycle is divided into a fixed day. The columns show an ideal twenty-four hour furnace, and real availability will be lower.





60 min
24.0 heats
55 min
26.2 heats
50 min
28.8 heats
45 min
32.0 heats
Cutting five minutes from a 55-minute cycle adds roughly 10 percent more heats, provided the caster, ladles and scrap supply can keep up. The gain is only real when the whole line can use it.

The Playbook, Phase by Phase

Each phase has its own usual delay and its own first fix. Work down the table and attack the phase with the largest avoidable time.

PhaseUsual DelayFirst FixMeasure
ChargingBasket not ready, crane busyPrepare the next basket during meltingGap between baskets
MeltingLow power, unstable arc, waiting for scrapMatch profile to scrap mixPower-on time per heat
RefiningWaiting on sample or temperatureTake readings early and in parallelTime from end of melt to ready
TappingLadle or tap-hole not readyStage the ladle ahead of the heatWait before tap
TurnaroundTasks done in sequenceDo tasks in parallelTime from tap to next charge

See Which Phase Is Costing Your Furnace the Most Time

Book a 30-minute session and iFactory AI will rank phase delays for your own heats, with minutes lost per heat for each cause.

Where the Avoidable Minutes Hide

Once delays are coded and ranked, a few causes usually dominate. The bars show illustrative average minutes lost per heat, and your own ranking will differ. Teams can see a delay ranking on their own furnace in a short walkthrough.

Waiting for scrap basket
2.0 min
Ladle or crane not ready
1.5 min
Sample and temperature wait
1.2 min
Tap-hole maintenance
0.8 min
Electrode additions
0.5 min
Other causes
0.5 min
These add up to about six and a half minutes per heat, and none of them is a melting problem. They are logistics and sequencing, and they respond to coordination more than to capital.

Capturing Delays So They Can Be Ranked

A ranking is only as good as the delay codes behind it. Three steps keep the data honest without burdening the crew.

1
Detect
The system spots gaps from power, door and charge signals.
2
Confirm
The crew picks the cause from a short list in one tap.
3
Review
Weekly review ranks causes and assigns owners.
Few codes
Mutually exclusive
Start and stop times
One named owner

Turnaround: Parallel Beats Sequential

Between tap and the next charge, four tasks often run one after another. Most can overlap. The chart compares an illustrative window with tasks in sequence and in parallel.

In sequence
Tap-hole clean
Clean
Electrode adjust
Adjust
Roof and panels check
Check
Charge preparation
Prepare
In parallel
Tap-hole clean
Clean
Electrode adjust
Adjust
Roof and panels check
Check
Charge preparation
Prepare
Safety interlocks and permits decide which tasks may overlap. The aim is to remove waiting, never to rush a safety check.

Faster Is Not Always Cheaper

Shortening the cycle helps energy as well, because less time spent waiting means fewer hours of heat loss. But pushing power to gain minutes can raise kWh per tonne if the arc is exposed late in the heat. The cycle and the power profile should be tuned together, which is why both are tracked heat by heat.

Less waiting
Fewer power-off minutes, less heat lost between heats.
Better profile
Higher power only where the bath absorbs it.
Stable slag
Foaming that lets the profile hold without exposing the panels.

A Composite Scenario: A Narrower, Faster Cycle

A melt shop compared tap-to-tap times for twenty heats before and after attacking the top delays. Each pair of columns is one range of minutes, using illustrative counts.

















Shorter cyclesLonger cycles
Before
After
The whole distribution moved left and narrowed. Fewer very long heats matter as much as a lower average, because those heats block the caster.

Keeping the Gain

Cycle time creeps back without a routine. Three habits hold the improvement.

Weekly Delay Review

Review the top three causes, agree actions and assign an owner and a due date.

Standard Work by Crew

Write down the fastest crew's sequence and use it as the shared standard.

Escalate Repeats

A delay that returns after a fix gets a deeper review, not another reminder.

Where iFactory AI Fits

Power data, door and charge signals, and heat records already contain the cycle. iFactory AI reads them and turns them into a delay ranking.

Automatic Phase Timing

Every heat is split into phases from signals already in your systems.

Delay Coding

Gaps are detected and confirmed by the crew in one step, then ranked.

Crew Comparison

Compare cycles by crew and shift to find the practice worth copying.

Energy and Time Together

See tap-to-tap and kWh per tonne side by side so neither is traded for the other.

Delivered turnkey, live in 6–12 weeks
iFactory AI arrives pre-configured on an NVIDIA server that ships racked and ready with software pre-loaded. Rack it, connect power and Ethernet, and EAF cycle analytics begin building. Scope covers cabling, network, ERP and MES integration, team training and 24×7 remote monitoring.
Weeks 1–4
Ship, network and connect furnace, crane and heat data
Weeks 5–8
Build phase timing and set up delay codes with the crews
Weeks 9–12
Go live with rankings and train melt shop leads
Melt shop lead: what cost us the most time this week?
iFactory AI: waiting for scrap baskets, about two minutes per heat on nights, and ladle readiness on the second furnace.

Frequently Asked Questions

How many minutes can we realistically take out?

It depends on where you start. A shop with long, uncoded delays has more room than one already running tight, and a few minutes per heat is a common order of magnitude. The honest answer comes from your own delay ranking, not from a generic range. iFactory AI's team can size the opportunity from a sample of your heat records.

Is a shorter tap-to-tap always better?

Only if the rest of the line can use it. If the caster, ladle supply or scrap yard cannot keep pace, a faster furnace simply waits elsewhere. Shorter cycles also should not come from pushing power that wastes energy or from skipping safety checks. The target is the shortest cycle that the whole process can absorb at stable quality and safe practice.

How do we get reliable delay data without paperwork?

Let the system detect gaps from power, door and charging signals, then ask the crew to confirm the cause from a short list. One tap per delay is realistic, long forms are not. Keep the code list short and unambiguous. See a one-tap delay capture flow in a short walkthrough with your own shift pattern.

Which crews should we learn from?

Compare crews on the same furnace and a similar scrap mix, so differences reflect practice and not conditions. The fastest crew's sequence for turnaround and charging is usually the best source of standard work. Share the comparison openly and ask the crews to explain the differences, since they often know reasons that the data alone cannot show.

How does tap-to-tap connect to kWh per tonne?

Less power-off time means less heat lost between heats, so shorter cycles usually lower kWh per tonne when power is applied well. iFactory AI tracks both measures per heat, so you can see whether a time gain helped or hurt energy. Ask support how time and energy are reported together in the EAF view.