EAF Water-Cooled Panel Leak Detection with AI Monitoring

By David Cook on October 21, 2026

eaf-water-cooled-panel-leak-detection-ai-monitoring

A cracked water-cooled panel rarely announces itself. The first litres boil off quietly on the slag, the heat carries on, and the circuit looks normal on a gauge nobody is watching. The danger comes when that water gets trapped under molten steel. EAF panel leak detection with AI compares inlet and outlet flow on every circuit, checks heat load and off-gas hydrogen, and speaks the alarm to the melt pulpit within seconds. See it on real furnace data in a short leak detection demo.

PREDICTIVE AI · MELT SHOP SAFETY

Catch a Panel Leak Before the Water Reaches the Bath

iFactory Predictive AI runs a flow-balance model on every panel circuit and cross-checks it against off-gas hydrogen. When both point to a leak, it calls the melt pulpit by voice and raises a panel repair work order with the evidence attached.

EAF 1 · Sidewall circuit SW-07Leak alarm
Flat bath · Heat 4471 · 14:32:06
Inlet42.0 m³/h
Outlet41.2 m³/h
Loss0.8 · 1.9%
Off-gas H₂Rising
Off-gas H₂OAbove model
Voice to melt pulpit"EAF one, circuit S W seven, flow loss one point nine percent, hydrogen rising."
Melter"Power off, circuit seven isolated."
Confirmed 14:32:19 · Repair WO-2291 raised for SW-07
EAF EXPLOSION RISK

Why a Small Furnace Water Leak Is a Big Risk

Water that lands on top of the slag usually boils away. The risk changes when the water is covered. AIST's Safety First column on EAF water leaks explains that tilting a furnace can let molten metal trap water, which then flashes to steam and expands roughly 1,700 times. Tenova and Steel Dynamics engineers add that a steam explosion can be followed by a second, more severe hydrogen and CO explosion. Talk through your own furnace risks with our melt shop team.

1Panel cracksThermal fatigue at welds, an arc strike or scrap impact opens a hole
2Water entersPressurised cooling water sprays or runs onto slag and scrap
3Water is coveredA tilt, slosh or slag movement traps it under metal or slag
4Steam formsRapid expansion, around 1,700 times its volume
5Second eventHydrogen and CO from the reaction can ignite
Not a rare event

The AIST column lists several US melt shop incidents linked to water entering a furnace, including fatal ones. In one, a pump kept feeding water into the furnace for at least seven minutes. Speed of detection and a clear response both matter.

WATER COOLED PANEL HOTSPOTS

Where Water-Cooled Panel Leaks Usually Start

Modern EAFs replace most of the upper shell and roof refractory with water-cooled panels. That keeps the furnace running longer between relines, but it puts hundreds of metres of pressurised pipe a short distance from the arc. Most leaks begin as thermal fatigue cracks in heavily welded tubular panels, according to AIST, while arc strikes and punctures cause sudden ones. Map the circuits on your furnace in a circuit review session.

Sidewall panels
Arc flare and scrap impactExposed when foamy slag is thin, and hit by heavy scrap during charging
Roof delta
Sparking and build-upA CCPS case links a cracked delta pipe to sparking near the electrodes
Roof panels
Splash and thermal cyclingRepeated heating and cooling every heat, plus slag and metal splash
Off-gas elbow
Hot gas and dust erosionHigh gas temperature and abrasive dust at the fourth hole duct
Burner and lance jackets
Close to the flameWater-cooled jackets sit in the hottest part of the shell wall
Hoses and fittings
Outside the shellLoss shows in flow balance but the water does not reach the bath
EAF PANEL LEAK DETECTION BEST PRACTICES

Five Ways to Detect a Panel Leak, and What Each Misses

No single signal catches every leak. A CCPS Process Safety Beacon on water and molten metal recommends comparing inlet and outlet flows continuously and installing hydrogen detection with high-priority alarms. The vendor of one off-gas system states plainly that it is not a failsafe that can catch every leak. Layering methods covers the gaps of each. Ask our support team which signals your furnace already has.

Method
What it measures
Catches well
Blind spots
Speed
Flow balance per circuit
Inlet minus outlet flow on each panel circuit
Leaks on one circuit, growing leaks, sudden ruptures
Very small leaks within meter accuracy, unmetered circuits
Seconds
Heat load and ΔT per panel
Outlet minus inlet temperature times flow
Hot panels, lost slag coating, early stress before a crack
Does not prove a leak on its own
Minutes
Supply and return pressure
Pressure loss across a header or circuit
Large ruptures, blocked or scaled circuits
Small leaks barely move pressure
Seconds
Off-gas H₂ and H₂O
Hydrogen, water vapour and CO in the off-gas
Water entering the furnace from any source
Cannot say which circuit, wet scrap and burners add noise
Seconds to minutes
Walkdowns and make-up water
Visual checks, steam, tank level, make-up flow
External leaks, slow system-wide loss
Cannot see inside a running furnace
Per shift
FLOW BALANCE MONITORING

A Worked Flow-Balance Example for One Circuit

In a closed cooling circuit, what goes into a panel should come out of it. A steady gap between inlet and outlet flow means water is going somewhere else. The numbers below show the arithmetic for one sidewall circuit. Before trusting a small gap, check that it is larger than the combined accuracy of the two flow meters and that it holds for more than a few seconds. Walk through your own circuits in a flow balance session.

Inlet flow, SW-0742.0 m³/h
Outlet flow, SW-0741.2 m³/h
Loss42.0 − 41.2 = 0.8 m³/h
Loss as share of inlet0.8 ÷ 42.0 = 1.9%
In litres800 L/h ≈ 13.3 L/min
If it continues for one hourAbout 800 litres, roughly 211 US gallons, into or around the furnace
Check the meters firstA gap smaller than the combined meter uncertainty is noise, not a leak. iFactory learns each circuit's normal offset during commissioning.
Watch the trend, not one readingA gap that grows heat after heat at the same point in the cycle is a crack opening up.
COOLING CIRCUIT MONITORING

Heat Load Shows Which Panel Is Under Stress

Heat load turns flow and temperature into one number: flow × specific heat × temperature rise. For SW-07, 42.0 m³/h is about 11.67 kg/s, and with an 11 °C rise and water at 4.18 kJ/kg·K that gives 11.67 × 4.18 × 11 ≈ 536 kW. Comparing each panel with its own normal level shows where the arc is working hardest, and where the next crack is likely. The grid is an illustration. Review your panel map with our cooling specialists.

EAF 1 sidewall · Heat 4471Deviation from each panel's normal heat load
SW-01−2%
SW-02+1%
SW-03+6%
SW-04+2%
SW-05+7%
SW-06+12%
SW-07+18% · loss
SW-08+11%
SW-090%
SW-10−1%
SW-11+5%
SW-12+3%
NormalWatch trendHigh heat loadHeat load plus flow loss
OFF-GAS HYDROGEN ANALYSIS

Using Off-Gas to Confirm Water Is Inside the Furnace

When water enters a furnace, part stays as vapour and part breaks down to hydrogen, so off-gas systems measure both. A paper by Tenova and Steel Dynamics notes that under normal reducing conditions the H₂ to CO ratio is usually below 1, and starts closer monitoring when it goes above 1. Wet scrap, humidity, burner combustion and electrode spray also add water, which is why off-gas works best next to flow balance. See the correlation on real heats in a live data walkthrough.

Flow loss + off-gas rise
Probable leak inside the furnaceAlarm tier. Pulpit acts now, per your site procedure.
Flow loss only
Leak outside the shell or meter faultWatch tier. Inspect hoses and fittings, check meter health.
Off-gas rise only
Wet charge, burner or unmetered waterWatch tier. Check the charge, burners and electrode spray.
Neither
Normal operationModels keep learning each circuit's baseline heat by heat.

A Leak Alarm the Melter Hears, Not a Trend Nobody Opens

iFactory speaks leak alarms to the melt pulpit, names the circuit and the evidence, and records the response. Slow-growing leaks become a repair work order for the next planned stop, with the flow trend attached.

Melt shop · Maintenance lead and iFactory
Maintenance leadWhich circuits went to Watch this week?
iFactoryTwo. SW-07 four times, always at flat bath, with loss growing from 0.6% to 1.1%. R-03 once during charging, and it cleared.
Maintenance leadPut SW-07 on Thursday's stop.
iFactoryDone. The repair work order for SW-07 is on Thursday's stop list with the flow and heat-load trends attached.
ALARM TIERS

Watch, Alarm, Trip: Three Levels With Clear Owners

An alarm system that cries wolf gets ignored, and one that waits too long is useless. The off-gas paper above describes alerts graded by the severity and duration of the event, and the same idea works for flow balance. The limits below are examples only. Each furnace needs its own, set from meter accuracy, normal circuit behaviour and your safety review. Set your tiers with our safety engineers.

Watch
Small, steady loss or one signal onlyExample: loss above 1% for 60 s, or off-gas rise without flow loss. Message to the melter, logged, trend shown.
Melter and maintenance
Alarm
Loss confirmed by a second signalExample: loss above 1.5% for 30 s with off-gas H₂ or H₂O above model. Voice alarm to the pulpit, response steps shown.
Melter and shift supervisor
Trip
Sudden large loss or ruptureExample: loss step above 3% or a sharp pressure fall. Handled by your PLC or safety interlock. iFactory alerts and records.
Furnace control system
FURNACE SHELL SAFETY RESPONSE

What the Crew Does When the Leak Alarm Sounds

The response belongs in your written procedure, and iFactory shows it rather than replacing it. Common guidance points the same way. India's Ministry of Steel EAF safety code lists stopping the arc, stopping any tilt or furnace movement and closing the water valve. AIST cites a procedure calling for shutting off the water and leaving the area. The sequence below follows that pattern, always per your site procedure. Rehearse it with our melt shop team.

1
Power offStop arcing at once
Pulpit
2
Raise electrodesClear of the bath, where your procedure calls for it
Pulpit
3
Do not tilt or move the furnaceMoving it can trap water under the bath
Pulpit
4
Isolate the circuitClose the valve for the leaking circuit, as your procedure allows
Pulpit or utilities
5
Clear the areaEveryone out of the furnace area to a safe point
Shift supervisor
6
Wait and verifyWater boils off, off-gas returns to baseline, check from a safe position
Supervisor approves
7
Lock out and repairIsolate, repair or replace the panel, test before return to service
Maintenance
EAF PANEL LEAK DETECTION TEMPLATE

The Panel Repair Work Order iFactory Raises for You

Finding a leak is half the job. The CSB's recommendation after the Carbide Industries furnace explosion called for a mechanical integrity programme with leak detection and repair. iFactory raises the repair order automatically, with the circuit, the evidence and the safety steps already filled in, so the panel shop does not start from a blank form. Ask our support team to map it to your CMMS.

WO-2291 · Panel repairRaised automatically
AssetEAF 1 · Sidewall panel SW-07
TriggerAlarm tier, 14:32:06, heat 4471
Flow evidenceInlet 42.0, outlet 41.2 m³/h, loss 1.9%
Off-gas evidenceH₂ and H₂O above model for 40 s
Heat load+18% against panel normal
HistoryFour Watch events this week
Safety stepsLockout, circuit drained, hot work permit
RepairWeld patch or panel swap, per inspection
Assigned toPanel shop, planner to approve
Return to servicePressure test passed, flow balance normal on first heat
EAF PANEL LEAK DETECTION COST AND ROI

Sizing the Value Without Inflating It

The main value of leak detection is the incident that never happens, and that should not be turned into a made-up number. What you can size is delay from leaks found late. The worksheet uses assumed inputs only to show the arithmetic. Replace them with your own delay records in a value review session.

Panel leaks found per year8, assumed
Leaks caught early at Watch tier5, assumed
Unplanned delay per leak found late2.5 h, assumed
Delay moved into planned stops5 × 2.5 = 12.5 furnace hours per year
Multiply by your own cost per furnace hour. Add fewer emergency panel swaps and better evidence for safety reviews, but leave injury costs out unless your data supports them.
TURNKEY AI DEPLOYMENT

Leak Models, Voice Alarms and Edge Server in One Delivery

iFactory delivers leak detection as a turnkey package. A pre-configured NVIDIA AI server ships racked and ready, with flow-balance and off-gas correlation models pre-loaded, and connects to your cooling water PLC and off-gas analyser on site. You rack it, plug in power and Ethernet, and the AI is live. Scope it for your furnace with our deployment team.

What's Included
  • Pre-configured NVIDIA AI edge server, racked and ready
  • Flow-balance model for every panel circuit
  • Heat-load baseline per panel, learned heat by heat
  • Off-gas H₂ and H₂O correlation with your analyser
  • Voice alarms to the melt pulpit with confirm-back
  • Automatic panel repair work orders in your CMMS
  • 24×7 remote monitoring of models and hardware
Live in 6–12 weeks
Wk 1–4
Connect and Map

Server racked, PLC and analyser linked, every circuit mapped and meter health checked.

Wk 5–8
Learn and Shadow

Baselines learned per circuit, alarms run silently and are reviewed with the melt team.

Wk 9–12
Go-Live and Drill

Voice alarms switched on, response drills run, work orders flowing to maintenance.

EAF PANEL LEAK DETECTION FOR PLANT MANAGERS

How iFactory Fits Your Melt Shop

iFactory works alongside your furnace control and safety interlocks, adding circuit-level insight and a faster human response. See how it fits in a short furnace demo.

1
Flow balance per circuit. Every panel circuit is modelled against its own normal behaviour, heat by heat.
2
Off-gas H₂ correlation. Flow loss is cross-checked against hydrogen and water vapour to confirm water is inside.
3
Voice alarm to the pulpit. The melter hears the circuit, the evidence and the response steps within seconds.
4
Automatic repair work order. The panel repair WO is raised with trends and safety steps attached.
1000+
Industrial clients running iFactory
99.9%
Platform uptime for continuous melt shops
6-12 wks
From racked server to live leak alarms
FREQUENTLY ASKED QUESTIONS

What Melt Shop Leaders Ask About EAF Panel Leak Detection

What is EAF panel leak detection?
It is the continuous monitoring of an electric arc furnace's water-cooled panels, roof and other cooled parts to find water escaping from the cooling circuits. It usually combines flow balance on each circuit, heat load per panel, pressure and off-gas analysis for hydrogen and water vapour.
How small a leak can flow balance detect?
It depends on the accuracy of your flow meters and how steady each circuit runs. A gap is only meaningful when it is larger than the combined uncertainty of the inlet and outlet meters and holds over time. Learning each circuit's normal offset and watching the trend across heats helps find slow leaks earlier.
Why use off-gas hydrogen analysis as well as flow?
Flow balance tells you which circuit is losing water. Off-gas tells you whether water is actually entering the furnace. Together they separate a leak inside the shell from a leaking hose outside it, or wet scrap from a cracked panel.
Does iFactory switch off the furnace?
No. Trips and interlocks stay with your furnace control and safety systems. iFactory detects, confirms, speaks the alarm to the pulpit, shows the response steps and records what was done, so the crew acts faster and every event is documented.
What should operators do when a leak alarm sounds?
Follow your site procedure. Published guidance typically covers stopping the arc, not tilting or moving the furnace, isolating the leaking circuit, clearing the area and waiting until the water has boiled off and conditions are confirmed safe before any movement or repair.
How do we get started?
Start with a circuit survey: which circuits have inlet and outlet flow meters, temperatures and pressures, and whether your off-gas analyser measures hydrogen. iFactory then learns baselines in shadow mode before alarms go live. Our support team can plan the survey with you.

Know Which Circuit Is Leaking Before Anyone Tilts

Run flow balance on every panel circuit, confirm with off-gas hydrogen and put a voice alarm in the melt pulpit. Repair orders follow automatically. Delivered turnkey and live in 6 to 12 weeks.

Example shift summary · EAF 1
Circuits monitoredSidewall, roof, delta, elbow
Watch events2, both trended
Alarms1, SW-07, confirmed by off-gas
Response loggedPower off and isolation in 13 s
Repair WO-2291 raised with full evidence