Count Rejects With a Second Line or Zone

By James Smith on November 20, 2026

count-rejects-second-line-zone

The quality factor of OEE is only as good as the reject count behind it. In Line OEE, each counting device can have an optional second line or zone for rejects. Point the camera so it also sees the reject path, draw the reject line or zone, and units that cross it are counted as rejects instead of good units. You can sign up to access Line OEE and add a reject zone to your first line, with 14 days of Pro features and no card.

iFactory Tools · Production · Counting sources

Count rejects, not just good units

A second line or zone on the same camera turns pushed-off units into a real quality figure.

REJECTSSecond line or zone
Good unitsRejectsQuality factorShift report
Line 2 · this shift
Good
Rejects
Quality
Main counting lineGood units
Reject zoneRejects
No reject sourceQuality 100 %

Rejects on the line card

Line 2 Cartoning card showing OEE so far 34.0 percent, 825 bottles an hour, normal speed 1.5 s and good 820 with 9 rejects
The line card shows good units and rejects side by side. Sample data from a test account, not customer results.

Good and rejects, side by side

In the test account, Line 2 showed 820 good bottles and 9 rejects for the shift so far. The rejects lower the quality factor straight away, and the same numbers flow into Hour by hour, Analysis and the shift report.

Three ways to record rejects

Reject zonea second line or zone on the camera picture
Add countsgood and rejected units for a line and period
Spreadsheetupload production records from a file

Use the reject zone where a camera can see the reject path; use entry or upload where it cannot. Without any of the three, quality reads 100 %.

Set up a reject zone

1

Frame both paths

Place the camera so the picture shows the main line and the place where rejects leave it.

2

Draw the counting line

Units crossing it are counted as good.

3

Draw the reject line or zone

Units crossing it are counted as rejects instead of good units.

4

Check against a real count

Run a few minutes and compare with a hand count before you rely on it.

Frame the line
Add a reject zone
Trust the quality

Make the quality factor real

Count rejects on the same camera that counts good units. Pro features are free for 14 days, no card required.

Where rejects show up

ViewWhat you see
Line cardGood / rejects for the shift so far
Hour by hourA Rejects column for each hour and the shift total
Analysis waterfallRejects as the last loss before fully productive time
Analysis By productGood, rejects and good % per product
Shift report (PDF)Rejects with output and stops for the shift

Rejects hour by hour and by product

In the test account, the morning shift on Line 1 had 256 rejects, and the last 7 days across lines showed 481 rejects against 30,800 good units, 98.5 % good.

Hour by hour table for Line 1 with a Rejects column per hour and 256 rejects for the shift
Hour by hour has a Rejects column for every hour of the shift. Sample data from a test account, not customer results.
Analysis By product table with 30,800 good, 481 rejects and 98.5 percent good
Analysis By product: good, rejects and good %. Sample data from a test account, not customer results.

What reject counting does not do

No defect types

Line OEE counts rejects; it does not classify them by defect. Keep reasons in your quality system.

No rework or first-pass yield

A reject is a reject. Rework and first-pass yield are not tracked separately.

Expert review

A close review of the counter and the data model shows rejects handled simply and consistently: a second line or zone per device, or entered counts, feeding one quality formula used everywhere.

The gap to plan for is the default. A line with no reject source shows 100 % quality, which flatters OEE. Set up a reject zone or a manual routine on every line where rejects happen. Figures shown are from a test account.

Reject counting questions

Why does quality read 100 % on my line?

Quality is good units divided by good plus rejected units. A line with no reject line, zone or entered rejects records good units only, so quality reads 100 %.

Can one camera count good units and rejects?

Yes, if it can see both paths. Each counting device can have an optional second line or zone for rejects, drawn on the same picture. You can sign up to access Line OEE and set one up.

What if the camera cannot see the reject path?

Enter rejects with Add counts for a line and a period, or bring them in with a spreadsheet upload. They feed the same quality factor.

Does Line OEE record why a unit was rejected?

No. It counts rejects; it does not classify reject or defect types. Keep defect reasons in your quality system.

Where do rejects appear?

On the line card next to good units, in the Rejects column of Hour by hour, in the Analysis waterfall and By product table, and in the shift report. You can get started with Line OEE and see them on your line.

Count rejects on your first line

Add a reject zone or enter rejects by hand, and watch the quality factor become real.

  • Second line or zone per device
  • Rejects in every view and report
  • Manual entry where cameras cannot see

Free for 14 days · no card needed

Reject sourcesLine · this shift
Quality
SourceGoodRejectsAuto
Camera line
Reject zone
Add counts
Sample layout, not customer resultsgood ÷ (good + rejects)

Share This Story, Choose Your Platform!