For plant & production managers
Line OEE & Production

Line OEE Tracker: Stops, Losses & Pack-out

Turn live line counts into OEE — availability, performance and quality — with stops, losses and pack-out tracked in one place, per line and per shift.

  • ✓Capture good and total counts from each line and watch OEE build from availability, performance and quality.
  • ✓See every stop by reason — changeovers, minor stops, breakdowns — ranked by the minutes they cost.
  • ✓Tie pack-out to the batch code and post the run to your ERP, with a shift report ready on demand.

14-day free trial · no credit card needed

Line OEE at a glance A × P × Q
85%OEE
Availability90%
Performance95%
Quality99.9%

A world-class line — availability × performance × quality.

Where you are
✓
From the lineCounts captured, live
This shift — you're hereStops & losses logged
On the boardOEE live by line
To your ERPPack-out & batch posted
Each line rolls up to a plant OEE — the same availability × performance × quality, from your live counts.

Articles

print-carton-labels-as-pdf
Read More

Print Carton Labels as PDF From Line OEE

Line OEE prints carton labels from the same records it uses for pack-out, so the label always matches the carton. In Pack-out, Print labels opens a label picker for a set of cartons, and each carton row has its own...

find-any-order-carton-batch-line-oee
Read More

Find Any Order, Carton or Batch in Line OEE

When someone asks what happened to an order or a batch, the answer should be one search away. Every page of Line OEE has a search box in the header labelled order, carton, batch. Type an order number, a carton...

put-line-factory-tv-screen-link
Read More

Put a Line on the Factory TV With a Screen Link

The TV screen button on the Line OEE Overview creates a link for a shop-floor display. Open the link in the browser of a TV, or on the small PC behind a monitor, and it shows a live scoreboard for...

needs-attention-lines-supervisor-should-look-at-now
Read More

Needs Attention: The Lines a Supervisor Should Look at Now

A dashboard with every number on it still leaves a supervisor to work out what matters. The Needs attention panel on the Line OEE Overview does that work. It lists the lines that need someone's action, each with a short...

upload-a-spreadsheet-of-production-records
Read More

Upload a Spreadsheet of Production Records to Line OEE

Most plants start with a spreadsheet, and Line OEE lets you bring it with you. The Upload a spreadsheet button sits in the header of every Line OEE page. Upload the file, match its columns to the tool's fields once,...

count-rejects-second-line-zone
Read More

Count Rejects With a Second Line or Zone

The quality factor of OEE is only as good as the reject count behind it. In Line OEE, each counting device can have an optional second line or zone for rejects. Point the camera so it also sees the reject...

pair-phone-qr-code-use-it-as-line-counter
Read More

Pair a Phone With a QR Code and Use It as a Line Counter

A phone is often the easiest camera to put over a conveyor. In Line OEE, choose the phone option in the Live section and a QR code appears. Scan it with the phone and a counting page opens in the...

oee-formula-planned-time-to-good-units
Read More

OEE Formula in Line OEE: Planned Time to Good Units

Line OEE publishes the formula behind every number it shows, so a supervisor can check any OEE figure by hand. It starts from planned time, takes away unplanned stops to get run time, compares what the line made with its...

start-without-cameras-runs-stops-and-cartons-by-hand
Read More

Start Without Cameras: Runs, Stops and Cartons by Hand

Line OEE does not need a camera to be useful. Set up your lines, shifts and products, then record the shift by hand: start a run, add counts, add stops with their reasons and pack cartons. OEE, the stop reasons,...

overview-every-lines-status-output-and-oee-now
Read More

Line OEE Overview: Every Line's Status, Output and OEE Now

The Overview is the first page of Line OEE and answers the question every shift starts with: what is each line doing right now? A plant summary for today sits at the top, a Needs attention panel lists the lines...

runs-and-orders-what-each-line-is-making-for-which-order
Read More

Runs and Orders: What Each Line Is Making, for Which Order

A run in Line OEE is a product made on a line for an order. The Runs & orders page lists every run with its status, line, order number, product, start time, length, units made against planned and rejects. Counts,...

raise-maintenance-work-order-stop
Read More

Raise a Maintenance Work Order From a Stop

When a line stops for a breakdown, the stop and the repair belong together. Line OEE and iFactory Maintenance share one asset list: every line, and every machine on it, is a Maintenance asset. That makes the hand-off one step....

pack-out-record-cartons-by-run-order-and-batch
Read More

Pack-Out: Record Cartons by Run, Order and Batch

Pack-out closes the gap between what a line made and what goes to stock. In Line OEE, each carton at the end of the line is recorded with its units, product, order, shift and batch, then held, released or posted....

what-posts-to-sap-business-one-and-when
Read More

SAP Business One and Line OEE: What Posts and When

Line OEE connects to SAP Business One through its Service Layer and posts three kinds of document from shop-floor records: receipts for released cartons, resource hours for ended runs and downtime rows for ended stops. Every posting is built, queued...

what-is-oee-and-how-it-is-calculated
Read More

What Is OEE? How Line OEE Calculates It

OEE, overall equipment effectiveness, says how much of a line's planned time went into good product. Line OEE calculates it as availability × performance × quality from the line's own records: shift time, stops with their reasons, the ideal cycle...

production-alerts-what-when-and-who
Read More

Production Alerts in Line OEE: What, When and Who

Setup → Alerts in Line OEE decides what the tool tells people about, and who hears it. Rules are checked every five minutes and each alert is raised once, so nobody gets the same message every five minutes. Four rules...

hero-automatic-work-orders-long-stops
Read More

Automatic Work Orders for Long Unplanned Stops

Some stops should always reach maintenance without anyone remembering to ask. Line OEE's work orders from downtime rule does that. Switch it on in Setup → Stop reasons and set the length: when an unplanned stop lasts at least that...

hero-add-counts-by-hand-no-camera
Read More

Add Counts by Hand When There Is No Camera

Line OEE works without a camera. The Add counts button sits in the header of every page of the tool and opens a form to record good and rejected units for a line over a period, such as the last...

analysis-oee-over-time-losses-reasons-and-shifts
Read More

Line OEE Analysis: OEE Over Time, Losses, Reasons and Shifts

Analysis is where Line OEE turns a period of records into answers. Pick today, yesterday, the last 7 days or the last 30 days, for all lines or one, and the page shows OEE against target, good units, minutes stopped...

hero-daily-table-csv
Read More

The Daily Table: Every Line, Every Day, Exportable as CSV

At the bottom of Line OEE Analysis, the Daily table gives one row per line per day for the period you pick: planned time, stopped time, good units, rejects and OEE. Pick a day to open it hour by hour....

hero-set-up-a-line
Read More

Set Up a Line: Code, Normal Speed, Target OEE and Stop Time

Setup → Lines & shifts is where each line in Line OEE is defined. Give it a short code such as L-01, a name, an area and the name of the unit it counts, such as bottles. Then set three...

hero-minor-stops
Read More

Minor Stops in Line OEE: Why They Lower Speed, Not Uptime

Line OEE follows the TPM convention for minor stops: they stay inside run time and count against performance, not availability. Two things land there. Gaps between units shorter than the line's stop time never become stop records, but they lengthen...

hero-food-beverage-sap-b1
Read More

Line OEE on Food and Beverage Packing Lines With SAP B1

Line OEE's count-to-carton-to-ERP flow fits food and beverage packers that run SAP Business One. On the line, a camera counts finished units, or a person enters them, and every gap becomes a stop with a reason. In Pack-out, each carton...

hero-hour-by-hour
Read More

Hour by Hour: Each Hour of the Shift Against Its Target

Hour by hour puts one line's shift on one table. Pick the line and the shift, and each row is an hour: planned minutes, the hour's target, good units, rejects, good against target, running totals, minutes stopped and the top...

count-production-browser-camera-pc-tablet
Read More

Count Production With a Browser Camera on a PC or Tablet

Line OEE can count a line with the camera of the PC or tablet it is open on, with no app to install. Open Live, pick the line, allow the camera and point it at the conveyor. Draw a counting...

line-oee-production-camera-counts-stops-pack-out
Read More

Line OEE & Production: Camera Counts, Stops, Pack-Out

Line OEE & Production is the iFactory tool for plant, production and operations managers who want OEE from real counts, not from a board filled in after the shift. A phone, tablet or PC camera in the browser counts each...

free-trial-14-days-of-pro-features-no-card
Read More

Line OEE Free Trial: 14 Days of Pro Features, No Card

Every new company starts Line OEE with a 14-day free trial of Pro features, and no card is needed. Bring your existing spreadsheet: upload it, match the columns once, and your records are in. Set up a line, point a...

pricing-pro-and-agentic-plans-per-user-per-month
Read More

Line OEE Pricing: Pro and Agentic Plans, per User per Month

Line OEE & Production is included in iFactory's Pro and Agentic plans. Plans are priced per user per month, not per machine or per line, and counting uses phones, tablets or PCs you already have, so there is no hardware...

shift-report-pdf-oee-output-rejects-stops-per-shift
Read More

Shift Report PDF: OEE, Output, Rejects and Stops per Shift

Line OEE writes the shift report for you. From Analysis, the Shift report (PDF) button produces a PDF for the period and the lines you have selected, and the same report can be emailed automatically after each shift. The emailed...

stop
Read More

The Stops Page: Every Stop, Found or Entered, With a Reason

The Stops page is the downtime log of Line OEE & Production, and it mostly fills itself. When a line's counts go quiet for longer than its stop time, a stop is written from the counts. Anyone can also add...

Total Articles:

Why OEE matters

Most lines run far below what the equipment can give

OEE puts one honest number on a line — and across manufacturing that number usually sits well under world-class, because the losses hide in stops, slow cycles and rejects nobody adds up.

60%

is a typical OEE across manufacturing lines — most plants sit here without realizing it.

85%

is world-class OEE, where the best-run lines operate — roughly 90% × 95% × 99.9%.

6
big losses

drag every line down — across availability, performance and quality — until each one is tracked.

What you get

Everything to run OEE on the line, in one place

Capture counts, watch OEE build, and see exactly where the line loses time — with pack-out and ERP posting wired in.

✓
Live OEE by line & shiftOne score per line, refreshed as counts come in, so the board matches the floor in real time.
✓
Availability · Performance · QualityThe OEE split for every line, so you see whether the loss is uptime, speed or rejects.
✓
Stops by reason, rankedEvery downtime event tagged and sorted by the minutes it costs — the biggest loss on top.
✓
Pack-out & batch codingUnits tied to a batch code built from date, line and shift — posted straight to the run.
✓
ERP postingReceipts from production to SAP Business One, with a test mode to check the mapping first.
✓
Shift report exportOne shift report for the plant manager, plus PDF or CSV export of the full run anytime.
How the number is built

How a line's OEE is built from three honest factors

OEE isn't one guess — it's three ratios multiplied together. The tracker builds each from your live counts, so the score reflects what the line actually did, not what the plan hoped for.

✓
Availability
Uptime

Run time ÷ planned production time — what breakdowns and changeovers cost you.

✓
Performance
Speed

Actual output ÷ ideal rate — the drag from minor stops and slow cycles.

✓
Quality
Good parts

Good count ÷ total count — start-up and running rejects taken out.

Your number
OEE
The product

Availability × Performance × Quality — one score per line, per shift.

A world-class line runs about 90% availability × 95% performance × 99.9% quality ≈ 85% OEE — the tracker builds that same number from your counts, and shows which factor is holding the line back.

Your lines, live

See where every line stands, in one view

OEE and its three factors for each line, with the top losses and pack-out beside them — refreshed as the shift runs.

Line OEE dashboard showing OEE, availability, performance and quality by line with downtime losses and pack-out

The Line OEE & Production board — each line's OEE, its three factors and its top losses in one list.

How it works

From line counts to live OEE in three steps

Set it up from the counts you already take, then let the losses and the score keep themselves current.

Line OEE ERP posting view showing production receipts posted to SAP Business One with test mode
1

Connect your counts

Feed good and total counts in by hand, from a PLC tag, or from the ERP — map the line, ideal rate and shift once and they come in with every run.

2

Stops & losses, categorized

Each stop is tagged to availability, performance or quality and ranked by the minutes it costs, so the biggest loss on every line surfaces on its own.

3

OEE live, posted to ERP

The score updates on the board, pack-out ties to the batch code, and the run posts to SAP Business One — with a shift report ready to export.

What we track per line

What the tracker follows for every production line

Counts come off the line, losses are split into the three OEE factors, and the finished run posts to your ERP. The tracker follows all three.

✓

Counts captured

Good and total counts from the line, live.

→
✓

Losses categorized

Each stop tagged to availability, performance or quality.

→
✓

OEE & pack-out posted

The score and the batch posted to your ERP.

Stops by reason, ranked

Where a line loses OEE is rarely a mystery once the stops are logged. Every stop is captured with a reason and tied to its line and shift, so the biggest loss sorts to the top — changeovers, minor stops, breakdowns and material waits, ranked by the minutes they cost.

Line OEE stops view showing each downtime event by reason, line and minutes lost
OEE status, watched

Every line, sorted into on target, watch or below

Each line is measured against its own OEE target. Watch flags a line slipping toward the threshold, and below-target surfaces on its own — so the line that needs attention finds you, instead of waiting for the end-of-week report.

On target

At or above the OEE target.

Line 1 — Packaging 87%
Line 4 — Cartoner 85%
Watch

Slipping toward the threshold.

Line 2 — Filler 78%
Line 5 — Palletizer 74%
Below target

Under the line — surfaced on its own.

Line 3 — Labeler 61%
Shift report

A production report your plant manager can read in a glance

At the end of a shift the manager wants one view: OEE and its three factors, the top losses, and pack-out tied to the batch. Export a shift report that covers it — ready when the line stops, not pieced together the next morning.

  • ✓OEE with availability, performance and quality
  • ✓Top downtime losses, ranked by minutes
  • ✓Pack-out and batch code, tied to the run
Line 1 — Shift reportGenerated at shift end
PDF
✓OEE 85% — 90% × 95% × 99.9%
✓Top loss: changeover, 42 min
✓Good vs total count, logged
✓Pack-out 12,480 units
✓Batch 261118-L01-L posted to ERP
Shift history includedExport PDF or CSV
Included with every tool

Everything comes standard

✓

Your whole team

Access limited to your company's own staff, with separate records kept per company.

✓

iFactory AI

Ask about your lines, losses and OEE in plain language.

✓

Your data stays yours

Export any time; if the trial ends without a plan, nothing is deleted.

✓

Hosted in the US

US hosting, with each company's records kept separate.

Who it's for

Built for any plant that runs production lines

If you count output and lose time to stops, OEE will tell you where — and this tracks it line by line.

Discrete manufacturing

Multiple lines and cells, each with its own OEE and losses to watch.

Food & beverage

High-speed filling and packaging where minor stops add up fast.

Packaging & converting

Changeover-heavy lines where availability makes or breaks the shift.

Multi-site operations

One OEE view and one export across every plant you run.

What changes on the floor

From a weekly guess to a live OEE

The point isn't another report — it's knowing where the line is losing time while the shift is still running.

See losses as they happen

Stops and slow cycles surface live, not at the end of the week.

Fix the biggest loss first

Downtime ranked by minutes, so the costliest reason is obvious.

Pack-out tied to the batch

Units and batch code posted to the ERP from the run itself.

One number across sites

Availability, performance and quality rolled into one OEE per line, per plant.

Questions

Line OEE questions, answered

The things plant and production managers ask before they start.

How is OEE calculated?+
OEE is Availability × Performance × Quality — run time vs planned, actual rate vs ideal, and good count vs total. A world-class line runs about 90% × 95% × 99.9% ≈ 85%. The tracker builds each factor from your live counts. See it on your line.
Can I bring counts in from our PLC or ERP?+
Yes — feed counts in by hand, from a PLC tag, or from the ERP. Map the line, ideal rate and shift once and they come in with every run. Try it on your line.
How are the six big losses handled?+
Breakdowns and changeovers map to availability, minor stops and slow cycles to performance, and start-up and running rejects to quality — so every stop lands in the right OEE factor and ranks by the minutes it cost. Start free.
Does it post to our ERP?+
Yes — receipts from production post to SAP Business One, with a test mode so you can check the mapping before anything goes live. Start free.
How does pack-out and batch coding work?+
Pack-out ties to a batch code built from date, line and shift — for example 261118-L01-L — so the units posted to the ERP trace straight back to the run that made them. See it on your list.
Is it standalone, or part of the portal?+
Both — use Line OEE on its own, or alongside the other iFactory production and quality tools in one portal. Start free.
What about the trial and our data?+
14-day free trial with Pro features, no card required. If the trial ends without a plan the workspace becomes read-only and nothing is deleted. Start your free trial.
Line OEE & Production

Turn live line counts into OEE, loss by loss

Connect your line once and the tracker builds OEE from every count — stops and losses categorized, pack-out tied to the batch, and the number posted to your ERP the moment the shift ends.

14-day free trial · Pro features · no credit card needed

Every line, counted to a number
1
Connect your lineManual, PLC or ERP counts
✓Availability
✓Performance
✓Quality
✓
OEE live & postedTo the board and your ERP