Raise a Maintenance Work Order From a Stop

By James Smith on November 20, 2026

raise-maintenance-work-order-stop

When a line stops for a breakdown, the stop and the repair belong together. Line OEE and iFactory Maintenance share one asset list: every line, and every machine on it, is a Maintenance asset. That makes the hand-off one step. On the Stops page, each unplanned stop has a Work order button, and the work order goes on the machine the stop names, or on the line. A rule in Setup can raise one by itself for long stops. You can sign up to access Line OEE and connect your first stop to a repair, with 14 days of Pro features and no card.

iFactory Tools · Production · Stops & downtime

Raise a maintenance work order from a stop

One button on the stop. The work order lands on the machine it names, or on the line, with the history kept.

STOP TO WORK ORDEROne click from the Stops page
Work order buttonMachine or lineAutomatic rulePlanned stops excluded
Stops · today
Stop found
Reason given
Work order
Machine breakdownWork order
Waiting for materialWork order
Planned breakNone

From stop to repair in four moves

1. The stopFound from the counts or entered, with a reason
2. Work orderPress the button on the stop
3. The assetThe machine named on the stop, or else the line
4. The historyThe stop shows the work order's number

Where the button is

On the Stops list, each unplanned stop has a Work order button under its reason. The planned break at the bottom has none.

Stops list where each unplanned stop has a Work order button under its reason
Stops: each unplanned stop has a Work order button; the planned break does not. Sample data from a test account, not customer results.

By hand or by rule

The rule is off until you switch it on in Setup.

From the Stops pageAutomatic rule
Who starts itAnyone, with the Work order buttonLine OEE, by itself
WhenAny time after the stopWhen an unplanned stop lasts at least the set minutes (30 by default)
Where it goesThe machine the stop names, or the lineThe machine the stop names, or the line
How oftenOnce per stopOnce per stop, and the managers are told
Planned stopsNo buttonNever raised
Work orders from downtime setting with a rule to raise a work order for a long unplanned stop, 30 minutes
Setup: the rule that raises a work order by itself for a long unplanned stop. Sample data from a test account, not customer results.
Stop recorded
Work order raised
History on the asset

Connect downtime to the repair

Every line and machine is already an asset. Start with the Stops page and add the rule when you are ready.

What has to be in place

iFactory Maintenance in the company

Work orders live in Maintenance, a separate iFactory tool. Without it, the Stops page has nothing to raise.

Machines on the line

Add the machines along each line in Setup. A stop that names one sends the work order to that machine.

A reason on the stop

Give the stop its reason, such as Machine breakdown, so the work order explains itself.

Lines and shifts settings where each line shows a Maintenance record chip
Each line carries a Maintenance record, because lines and machines are Maintenance assets. Sample data from a test account, not customer results.

Expert review

A close review of the maintenance link in the product repository shows a careful design: lines and machines are kept in step with Maintenance assets, a stop raises at most one work order, and the automatic rule never fires for planned stops.

The link only works for a company that also has iFactory Maintenance, so plan for both tools. Screenshots here are from a test account, not customer results.

Frequently asked questions

Who can raise a work order from a stop?

Anyone can raise a work order from a stop on the Stops page. Once raised, the stop shows the work order's number, so the same stop is not raised twice.

Which asset does the work order go on?

On the machine the stop names, or on the line if no machine was named. Every line and every machine on it is a Maintenance asset, so the repair history sits on the right one.

Can a work order be raised automatically?

Yes. In Setup, switch on Raise a work order for a long unplanned stop and set the minutes, 30 by default. It raises one per stop and tells the managers. You can sign up to access Line OEE and try the rule on a test line.

Do planned stops raise work orders?

No. Planned stops, such as breaks and meetings, never raise one, and the Stops list shows no Work order button for them.

Do we need iFactory Maintenance as well?

Yes. Work orders live in Maintenance, a separate iFactory tool with work orders on a board and problems reported by QR code at the machine. Without it, there is nothing to raise. You can get started with Line OEE first and add it later.

Turn your next breakdown into a work order

Record stops in Line OEE and raise the repair from the same list.

  • Work order button on each unplanned stop
  • Goes on the machine or the line
  • Optional rule for long stops

Free for 14 days · no card needed

Stop to work orderStops page · Setup
Maintenance
StopButtonRuleAsset
Machine breakdown
Long unplanned stop
Planned break
Sample layout, not customer resultsOnce per stop

Share This Story, Choose Your Platform!