When a line stops for a breakdown, the stop and the repair belong together. Line OEE and iFactory Maintenance share one asset list: every line, and every machine on it, is a Maintenance asset. That makes the hand-off one step. On the Stops page, each unplanned stop has a Work order button, and the work order goes on the machine the stop names, or on the line. A rule in Setup can raise one by itself for long stops. You can sign up to access Line OEE and connect your first stop to a repair, with 14 days of Pro features and no card.
iFactory Tools · Production · Stops & downtime
Raise a maintenance work order from a stop
One button on the stop. The work order lands on the machine it names, or on the line, with the history kept.
From stop to repair in four moves
Where the button is
On the Stops list, each unplanned stop has a Work order button under its reason. The planned break at the bottom has none.
By hand or by rule
The rule is off until you switch it on in Setup.
| From the Stops page | Automatic rule | |
|---|---|---|
| Who starts it | Anyone, with the Work order button | Line OEE, by itself |
| When | Any time after the stop | When an unplanned stop lasts at least the set minutes (30 by default) |
| Where it goes | The machine the stop names, or the line | The machine the stop names, or the line |
| How often | Once per stop | Once per stop, and the managers are told |
| Planned stops | No button | Never raised |
Connect downtime to the repair
Every line and machine is already an asset. Start with the Stops page and add the rule when you are ready.
What has to be in place
iFactory Maintenance in the company
Work orders live in Maintenance, a separate iFactory tool. Without it, the Stops page has nothing to raise.
Machines on the line
Add the machines along each line in Setup. A stop that names one sends the work order to that machine.
A reason on the stop
Give the stop its reason, such as Machine breakdown, so the work order explains itself.
Expert review
A close review of the maintenance link in the product repository shows a careful design: lines and machines are kept in step with Maintenance assets, a stop raises at most one work order, and the automatic rule never fires for planned stops.
The link only works for a company that also has iFactory Maintenance, so plan for both tools. Screenshots here are from a test account, not customer results.
Frequently asked questions
Who can raise a work order from a stop?
Anyone can raise a work order from a stop on the Stops page. Once raised, the stop shows the work order's number, so the same stop is not raised twice.
Which asset does the work order go on?
On the machine the stop names, or on the line if no machine was named. Every line and every machine on it is a Maintenance asset, so the repair history sits on the right one.
Can a work order be raised automatically?
Yes. In Setup, switch on Raise a work order for a long unplanned stop and set the minutes, 30 by default. It raises one per stop and tells the managers. You can sign up to access Line OEE and try the rule on a test line.
Do planned stops raise work orders?
No. Planned stops, such as breaks and meetings, never raise one, and the Stops list shows no Work order button for them.
Do we need iFactory Maintenance as well?
Yes. Work orders live in Maintenance, a separate iFactory tool with work orders on a board and problems reported by QR code at the machine. Without it, there is nothing to raise. You can get started with Line OEE first and add it later.
Turn your next breakdown into a work order
Record stops in Line OEE and raise the repair from the same list.
- Work order button on each unplanned stop
- Goes on the machine or the line
- Optional rule for long stops
Free for 14 days · no card needed