OEE Formula in Line OEE: Planned Time to Good Units

By James Smith on November 20, 2026

oee-formula-planned-time-to-good-units

Line OEE publishes the formula behind every number it shows, so a supervisor can check any OEE figure by hand. It starts from planned time, takes away unplanned stops to get run time, compares what the line made with its ideal cycle, and ends with the share of good units. The same code runs the pages, the PDF shift report, iFactory AI and the tests, so every view agrees. You can sign up to access Line OEE and check the formula on your own line, with 14 days of Pro features and no card.

iFactory Tools · Production · OEE method

From planned time to good units, in six steps

Availability × performance × quality, with the rules behind each step written down.

FORMULAISO 22400 and common practice
Planned timeRun timePerformance capGood units
OEE · how it is built
Availability
Performance
Quality
Planned breaks and meetingsNot a loss
Unexplained stopsCount as stopped
Performance above 100 %Capped

The formula at a glance

Availabilityrun time ÷ planned time×Performanceideal cycle × units ÷ run time×Qualitygood ÷ (good + rejects)=OEE

Units per hour are total units divided by run hours. The world-class reference shown on line cards is 85 %, that is 90 % × 95 % × 99.9 %.

Six steps, in the order Line OEE runs them

1

Planned time

Shift time minus planned breaks minus stops in the planned category, such as a meeting or training.

2

Run time

Planned time minus unplanned stops: breakdown, setup, material and quality-hold stops, plus any stop with no reason yet.

3

Availability

Run time divided by planned time.

4

Performance

Ideal cycle time multiplied by total units, divided by run time, capped at 100 %.

5

Quality

Good units divided by good plus rejected units.

6

OEE

Availability × performance × quality.

The same steps in the portal

Analysis draws the formula as a waterfall: each loss is a bar between planned time and fully productive time, and the last bar is the OEE.

Where the time went waterfall from planned time 17 h 01 min down to fully productive time 11 h 21 min, 66.7 percent
Where the time went: planned time, run time, net run time and fully productive time, with each loss in between. Sample data from a test account, not customer results.
Line OEE Analysis tiles for the last 7 days: OEE 66.7 percent, 30,800 good units with 481 rejects, 52 minutes stopped and normal speed 1.3 s
Analysis, last 7 days, all lines: OEE, good units, stopped time and normal speed. Sample data from a test account, not customer results.

Reading the test account through the formula

Run time lost under 5 % to stops, reduced speed took most of the rest, and rejects took about 1 %. The formula makes the biggest loss obvious.

Planned time17 h 01 min
Run time95.3 %
Net run time67.7 %
Fully productive66.7 %

Shares of planned time from the Analysis waterfall above, all lines, last 7 days. Sample data, not customer results.

Plan the shift
Count the units
Check the maths

See every factor on your own line

Availability, performance and quality per line and per shift. Pro features are free for 14 days, no card required.

Rules that keep the number honest

SituationHow Line OEE treats it
Minor stop or jamStays in run time, so it lowers performance (TPM convention)
Two machines down at onceOverlapping stops are counted once
A stop still openCounts up to now
Line quiet, no stop written yetCounted as unexplained stopped time
Planned time but zero unitsShown as no production, not 100 %
Normal speed set too slowPerformance capped at 100 %

On the line card

Overview line card showing OEE so far 29.2 percent of what it could make, target 75 percent, world class 85 percent
A line card shows OEE so far for the shift against the line's target and the 85 % world-class reference. Sample data from a test account, not customer results.

OEE so far, this shift

Each line card on the Overview applies the same six steps to the shift so far and shows the result against the line's own target and the 85 % reference. A Why? control sits beside the figure.

Two things to set correctly

Normal speed drives performance

Use the best time you have seen for one unit. A slow value hides losses because performance is capped at 100 %.

Reasons decide the bucket

A stop with no reason counts against availability. Giving it a planned reason moves it out of planned time.

Expert review

A close review of the calculation code and its documentation shows a standard availability × performance × quality model, with sensible rules for open stops, overlaps and lines that made nothing. Because one module feeds every view, the figure on the TV, the PDF and the chat answer cannot disagree.

The performance cap is the one to watch: it protects against impossible values, but it also hides a normal speed that was set too slow. Figures shown are from a test account, not customer results.

OEE formula questions

Why is performance capped at 100 %?

Performance compares the ideal cycle with what the line actually made in its run time. A result above 100 % usually means the normal speed was set too slow, so Line OEE caps it rather than letting OEE run past what is possible.

Which stops count against availability?

Breakdown, setup, material and quality-hold stops, plus any stop that has not been given a reason yet. Planned stops such as breaks and meetings come out of planned time instead, so they never lower OEE.

Where do minor stops go?

Minor stops stay inside run time, so they lower performance, not availability. This follows the usual TPM convention.

What happens when a line is planned but makes nothing?

Planned time with zero units shows as no production, not as a misleading 100 % or 0 %. You can sign up to access Line OEE and see this on a test line.

Do the PDF report and iFactory AI use the same formula?

Yes. The calculation code is shared by the pages, the PDF shift report, iFactory AI and the tests, so the same period gives the same OEE everywhere. You can get started with Line OEE and compare them yourself.

Check the formula on your own line

Set a shift and a normal speed, count for a day, then trace each factor in Analysis.

  • Planned time from shifts and breaks
  • Performance capped at 100 %
  • Same result in pages, PDF and AI

Free for 14 days · no card needed

OEE build-upLine · this shift
A × P × Q
StepTimeUnitsFactor
Availability
Performance
Quality
Sample layout, not customer resultsOEE

Share This Story, Choose Your Platform!