A monthly checklist is not a special kind of list. It is any checklist set to the Monthly frequency, which means a round falls due 30 days after the last one. The ready example in iFactory Inspection is the Electric motor monthly check, with 13 items for a technician in about 15 minutes. This page lists what it covers, how a monthly round is followed up and what else you can set to monthly. Set up your monthly rounds in your workspace once your company is set up.
Inspection · Monthly checklist
Monthly Maintenance Checklist for Plant Equipment
This page covers the ready monthly check in the library and how a monthly round works from the day it falls due to the day it is followed up.

What the ready monthly check covers
The Electric motor monthly check.
- SafetyThe round begins at the terminal box and the earth strap, which are checked by looking at them. Nothing is opened while the motor is live.Look at the box with the lid on and the screws in. Do not open it on a live motor, and keep any inspection inside the box for a locked-out visit.
- MechanicalNext come the hold-down bolts and the coupling or pulley, which need the motor stopped and locked out before the guard comes off.These are lockout steps, so plan them with production at the start of the month and do them under one isolation.
- Temperature and vibrationThen the live readings: frame and bearing temperatures, vibration and noise, taken while the motor is running.The temperature and vibration items are High priority, so a failure on any of them is due in 24 hours.
- LubricationGreasing.Greasing is done if it is due, as the how-to-check line says, so the motor is not over-greased on a round where it does not need it.
- ElectricalThe insulation test is done when it is due and not every month, and the running current is read on all three phases with a clamp meter.These are a mix of Medium and High items, which means their work orders fall due in 72 hours or 24 hours.
- HousekeepingCleanliness.Finish with the cleanliness of the motor body: the dust layer should be under 1 mm and there should be no oil on the frame.
Every 30 days
Once the round is submitted, the clock restarts and the next monthly round falls due 30 days after the day it was actually done.
Monthly or something else
The other ready checklists use different frequencies, from every shift for the crane to weekly for the pump, compressor and gearbox.
Monthly
Electric motor check
30 days after the last
Other frequencies
Weekly, daily or every shift
You can change the frequency
After the round
Everything from the round is kept, so the month can be looked back on without anyone searching through paper.
Failed items
Work orders by priority
Each failed item raises its own work order from the round, with the note and the limit attached.
Each round
Kept as a PDF
The same results are in the History CSV, so a monthly meeting can be run from a spreadsheet.
Where the frequency is set
The frequency is chosen when a checklist is created or edited, so any checklist can be made monthly, not only the motor one.

Cautions
These points are worth settling before the first monthly round, because the app asks the questions and cannot answer them for you.
Plant equipment
The ready checklist is not a home or yard maintenance list. It is an industrial equipment round for a low-voltage motor.
OEM manual
The limits are general figures. Check every one against the motor maker's manual before the first round.
Edit freely
Change any item in your own copy of the checklist, so it matches the motors you actually have on site.
What a monthly check is for
A monthly checklist covers things that change slowly enough that a weekly look would be wasted effort, but fast enough that a yearly one would miss them. In the ready library the electric motor check is the monthly one: 13 items, about 15 minutes, with three of them flagged for lockout.
It is an inspection round, not a service. The technician measures, looks and listens against limits, and anything that fails becomes a work order. It does not replace the lubrication, cleaning or replacement tasks in your preventive maintenance plan.
What the motor check covers
The items run from the safety basics to the measurements: the terminal box lid and cable gland, the earth strap and the fan cowl, then the hold-down bolts, the coupling or pulley, frame and bearing temperature, bearing vibration, noise, grease when due, insulation when due, running current on all three phases and the cleanliness of the motor body. The ones that need the motor isolated, such as insulation resistance and the terminal box, are the ones flagged for lockout.
Most items are Medium or High. The ready checklist keeps urgent items for things that put people at risk, and most of a motor round is condition monitoring.
Fitting monthly checks into your calendar
The next monthly round is due a month after the last one was done. Pick a week of the month that suits the plant, assign a technician or a role and let the home screen show what is due. If a motor cannot be stopped that week, the round shows as overdue, and the lockout items can be planned with production.
Monthly checks also work well for a smaller group of critical assets, with the weekly rounds covering the rest. You choose which assets each checklist covers when you save it.
Reviewing the month
At the end of the month, History shows each round with its results and notes, and the Findings tab lists failures with their work orders. Export to CSV if you want to discuss them in a meeting.
The record is the answer for each item, OK or Failed, with notes and photos. The app does not store readings such as amps or temperatures as numbers, so use the note for values you want to keep.
Making the month fit
Monthly checks are easy to push back, because nothing seems urgent. The way to keep them in place is to attach them to something fixed, such as the first week of the month, and to give each one a named technician. The home screen shows overdue rounds first, so a missed one is visible to whoever plans the week.
The lockout items on the motor check, the hold-down bolts, the coupling or pulley and the insulation test, need the motor stopped. Plan these with production at the start of the month so the stop is part of the schedule.
Keep the live items, temperature, vibration and current, in the same visit to make best use of the time.
Frequently asked questions
What makes a checklist monthly?
Its frequency. A monthly checklist is any checklist set to the Monthly frequency in iFactory Inspection, which means a round falls due 30 days after the last one. It is chosen when a checklist is created or edited. The ready example is the Electric motor monthly check, with 13 items for a technician in about 15 minutes.
What is on the ready monthly checklist?
The Electric motor monthly check covers the terminal box and earth strap, hold-down bolts and coupling, frame and bearing temperatures, vibration, noise, greasing if due, the insulation test when due, current on all three phases, and the cleanliness of the body. Three items are lockout steps, and most are Medium or High priority.
Can I make another check monthly?
Yes. Edit the checklist, or create one from a ready checklist, and set the frequency to Monthly when you save it. Monthly also suits a smaller group of critical assets, with weekly rounds covering the rest. You choose which assets each checklist covers. Remember that the limits should still be checked against the maker's manual.
What happens when a monthly round is missed?
It shows as overdue on the home screen, listed first, until somebody does it. The next round is then due 30 days after the day it was actually done, not after the day it was meant to be done. The app does not send an email or a push message for an overdue round, so the home screen needs to be checked.
What is kept from each monthly round?
The round is kept with who did it and when, and each item's answer, OK or Failed, with notes and photos. Failed items are raised as work orders in the Findings tab. The app does not store readings such as amps or temperatures as numbers, so use the note for values you want to keep.
Does a monthly check replace preventive maintenance?
No. It is an inspection round, not a service. The technician measures, looks and listens against limits, and anything that fails becomes a work order. It does not replace the lubrication, cleaning or replacement tasks in your preventive maintenance plan. The two work best together, with inspections finding what the planned work missed.